THE SHORT ANSWER

Compare American mahjong OEM quotations only after the suppliers are pricing the same purchasing unit, component list, specification and packaging. OEM here means manufacturing to an agreed design and specification; it does not imply that every development or branding task is included in the unit price. Ask for product, development, sample, logo, packing and logistics costs to be identified as included, separately charged, not applicable or pending confirmation. An unknown charge is not zero. This guide supplies a comparison method, not factory prices or a price range.

Product arrangement; not an inventory diagram or a customer endorsement. Finished specifications require sample approval.

Give each supplier the same specification

Create one versioned bill of materials: the list of items and quantities inside the unit you intend to buy. State whether the quote is for tiles alone, selected accessories or a coordinated collection. Record material, full tile dimensions, artwork status, colors, component quantities and packaging requirements.

The minimum order quantity is 100 pieces per color, per size. Give the quantity for every color-and-size combination and specify the purchasing unit and its components. Mixed-category requirements can be discussed, but they do not imply an exception to the stated minimum.

Compare line items, not only the total

For each line, record the amount and currency when actually quoted, the charging unit, the quantity basis, the included work and the exclusion. Ask whether a one-time cost is quoted separately or already included in the unit price, so it is not counted twice.

Line itemHold constant or clarifyDo not assume
Bulk productsMaterials, dimensions, tile inventory, component list, finish, quantity and sale unitTwo products called a set contain the same items
Development or setupArtwork work, construction development or tooling if applicable; ownership/use of deliverables where relevantEvery project needs tooling or every quote includes design work
Samples and revisionsSample contents, physical materials, logo inclusion, revision allowance, sample shipping and any later creditFree samples, unlimited revisions or automatic fee refunds
Logo and decorationMethod, locations, artwork version, setup and per-unit charges if applicableA color preview confirms a particular production method or price
PackagingStandard wrap versus custom bag, box, insert, labels and outer cartonA gift box or custom packaging is included in a tile-only price
Inspection or testingAgreed inspection scope or required reports, their coverage and who paysA process photograph is a certificate, or an unspecified inspection is included
Domestic and international logisticsCollection point, destination, packing data, freight scope and responsibility for each legManufacturing time includes delivery, or both suppliers quote the same freight service
Payment and exclusionsCurrency, validity period, payment conditions, taxes/duties and charges explicitly excludedA pending fee is zero or every supplier uses the same payment terms

Keep packaging and transport responsibilities visible

The confirmed standard packaging for Mahjong Atelier tiles is cellophane wrapping; custom storage bags are available. A branded bag, gift box or other pack-out is a separate scope to confirm, not an automatic inclusion in that statement.

If you or your forwarder will arrange international transport, ask for the collection point, carton count and dimensions, gross/net weights and any relevant domestic delivery charge. If the supplier is asked to quote international freight, provide the destination and request the service scope and exclusions. Do not add two freight lines that cover the same leg.

Resolve differences before ranking the offers

Use the existing quotation-comparison worksheet to mark each item confirmed, excluded or open. Ask the supplier to revise the quote where its scope differs from your brief. Only then compare the commercial totals alongside sample acceptance, documented capabilities and the completeness of the response.

Record quotation date, validity, sample requirements and production start conditions. A lower number is not a saving if it excludes components you need. Likewise, a higher price does not establish better quality without evidence. Keep the accepted quotation with the approved specification and sample reference.

Buyer questions

Why not compare the quoted unit prices immediately?

Different purchasing units, component counts, packaging and exclusions can make the numbers unlike-for-like. Align those details before deciding which price applies to your requirement.

Will the sample fee be credited against a production order?

That must be confirmed for the project. Record the eligibility, amount and conditions if a credit is offered; do not assume a website planning guide promises it.

Do I need to send other suppliers’ quotations to request a quote?

No. A clear requirement and the unresolved scope questions are enough to start. If you later share comparison material, remove confidential supplier and customer details you are not authorized to disclose.

What should I include in the three-field inquiry?

Use your work email, select the relevant product category and put the scope in project details: quantities and units, components, colors, artwork status, packaging, destination and target timing. Leave genuinely unknown items as questions.

Sources, publisher and limits

This guide is published by Mahjong Atelier to support its own B2B quotation conversations. It is not an independent ranking of suppliers, a market price survey or a recommendation to choose this supplier over an unassessed alternative.

Commercial details follow the site’s confirmed ordering and packaging scope. Sample fees, revisions, credits, deposits and payment methods are inquiry-based. A player discussion about tile prices helped identify the value question, but it provides no evidence for OEM costs or wholesale price ranges.

Product arrangement; confirm the selected configuration against an approved physical sample.

KEEP THIS CHECKLIST

  • List each product and quantity per color and size
  • Record specifications, packaging and unresolved items
  • Agree project-specific sampling and production timing
  • Keep the accepted quotation and sample approval record

Sources & context

  1. Ordering terms and confirmed scopePublisher commercial terms; owner confirmed 2026-10-08 · Accessed 2026-10-08
  2. Sample approval worksheetPlanning template, not a completed inspection · Accessed 2026-10-08
  3. Quotation comparison worksheetScope comparison template; no price promise · Accessed 2026-10-08

Forum excerpts are qualitative feedback. Product specifications describe linked products only. Recommendations are editorial judgments, not lab results or statistical popularity rankings. Editorial policy.

Continue your research

10 questions to ask a mahjong manufacturer before ordering ↗A practical shortlist for comparing factories and suppliers on the same basis.Custom mahjong MOQ and lead times: define the unit and approval stages ↗Clarify the purchasing unit, mixed-color allocation and start conditions for sampling and production before planning a custom mahjong order.Compare OEM and ODM ↗Compare OEM / ODM services ↗Prepare a product brief ↗

Turn the answer into your next collection.